Independent 3D studio · Lincoln, UK
← All projects

Integrated pump-and-tank skid

A compact equipment arrangement combining a tank, pumps and supporting frame.

Archived engineering drawing excerpt.
THE PROJECT

The work in detail.

The skid layout brings the tank and pumping equipment into one coordinated assembly. The drawing records a removable tank arrangement for transport alongside the supporting steelwork.

This drawing forms part of Scott’s earlier engineering experience at JTL / GAF. It is presented in the Lincs 3D portfolio to illustrate that CAD and detailing background.

View drawing excerpt PDF ↗

Explore more projects →